Oil production
85BOPD
Integrated CSS + SRP operating intelligence for the selected Baghewala well.
Oil production
85BOPD
Predicted production
98BOPD
Reservoir temperature
82°C
Reservoir pressure
18bar
Crude viscosity
450cP
SRP efficiency
71%
Pump efficiency
72%
Rod floating risk
18%
Rod failure risk
12%
Pump unsetting risk
9%
Steam-oil ratio
5.2
Energy / bbl
100% base
30-day history with a 14-day simulated prediction band
WELL OPTIMIZATION SCORE
81/100
Current simulated operating envelope
Reservoir cooling is increasing viscosity and reducing predicted inflow; optimize CSS timing while reducing SRP speed to preserve equipment life.